logo

Underground Flow Equalization System

Sector: Cement • Location: San Mateo, California, United States of America (USA)

Source: City of San Mateo

Project
Approved

The City of San Mateo is implementing a series of capital projects, referred to collectively as the Clean Water Program (CWP), to replace aging wastewater infrastructure, build wet weather capacity, comply with regulatory requirements, and align with the City’s sustainability goals. The Underground Flow Equalization System (UFES) project, consistent with the Council’s selected program alternative,

Project Information FAQ

Project Information

4 Q
The project “Underground Flow Equalization System” is an infrastructure initiative in the Cement sector, located in San Mateo, California, United States of America (USA). Taiyo aggregates data on it from City of San Mateo.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City of San Mateo is implementing a series of capital projects, referred to collectively as the Clean Water Program (CWP), to replace aging wastewater infrastructure, build wet weather capacity, comply with regulatory requirements, and align with the City’s sustainability goals. The Underground Flow Equalization System (UFES) project, consistent with the Council’s selected program alternative, will provide the wastewater system capacity to comply with regulations requiring prevention of sanitary system overflows. This project consists of a concrete holding structure, pump station, diversion sewers and force main, and on odor control equipment room. These facilities would be located underground. Access hatches, an emergency backup generator, and an electrical building and vents for treated air would be located at ground level. The proposed project will provide for short-term storage of wastewater to prevent sanitary sewer overflows during wet weather.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data