logo

Underground integrated pipe gallery of Cuijia Datan Area

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

Within the scope of project implementation, a comprehensive pipe gallery under 7 roads will be built. The total length of the pipe gallery is 15.2km and there are 9 sub-control rooms in the area. The entrance pipelines are 7 types of electricity, communication, water supply, reclaimed water, heat, gas and sewage. The pipeline and cabin are 3-4 cabins, including 0.85km for S084, 5.79km for Nanbinhe

Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Road, Government, Hydro, Bridge, Power Transmission, Waste Processing and Treatment
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Underground integrated pipe gallery of Cuijia Datan Area

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Underground integrated pipe gallery of Cuijia Datan Area” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Within the scope of project implementation, a comprehensive pipe gallery under 7 roads will be built. The total length of the pipe gallery is 15.2km and there are 9 sub-control rooms in the area. The entrance pipelines are 7 types of electricity, communication, water supply, reclaimed water, heat, gas and sewage. The pipeline and cabin are 3-4 cabins, including 0.85km for S084, 5.79km for Nanbinhe Road, 2.85km for S095, 3.48km for B091, 1.04km for T088, 0.66km for B096 and T098 0.53km. SPV is Lanzhou Zhengji Pipe Gallery Project Management Co., Ltd., a JV between the sponsors China Power Construction Road and Bridge Group Co., Ltd. (42%), China Water Resources and Hydropower Third Engineering Bureau Co., Ltd. (28%) and the state-owned Lanzhou Underground Comprehensive Pipe Gallery Co., Ltd. (30%). BOT is the type of concession with a contract period of 30 years. Financial close took place on March 17, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=c296557c1a6544ad8404ca4dc95a756e

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Road, Government, Hydro, Bridge, Power Transmission, Waste Processing and Treatment

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project