logo

Underground Madrid M-30 Beltway

Sector: Commercial • Location: Madrid, Spain

Source: Highways Today

Project
Ongoing

Ferrovial, via its construction subsidiary, has been awarded the contract to underground Madrid’s M-30 beltway in the vicinity of the Calderón stadium. The project is intended to provide continuity to the Calle 30 tunnel, as this is the only segment of the southern arc of the road that is still overground, since it ran below the western stand of the Vicente Calderón stadium. The project will also

Project Information FAQ

Project Information

4 Q
The project “Underground Madrid M-30 Beltway” is an infrastructure initiative in the Commercial sector, located in Madrid, Spain. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial, via its construction subsidiary, has been awarded the contract to underground Madrid’s M-30 beltway in the vicinity of the Calderón stadium. The project is intended to provide continuity to the Calle 30 tunnel, as this is the only segment of the southern arc of the road that is still overground, since it ran below the western stand of the Vicente Calderón stadium. The project will also expand the “Madrid Río” park by eliminating this section of overground highway, which is a barrier to mobility. The work consists of building a cut-and-cover tunnel 620 meters long with a width varying from 26 meters at its southern end to slightly over 21 meters at its northern end. The new infrastructure will have all the facilities and services required to operate it and integrate with the adjoining sections of Calle 30; the tunnel roof is designed to accommodate bushes and trees to create a new green area linked to the “Madrid Río” park. The work, which is scheduled to take 20 months, will be conducted while maintaining traffic flows in both directions along the M-30 using a provisional detour under the demolished stadium. Ferrovial was previously involved in undergrounding other parts of Calle 30, specifically the Southern Bypass, the North Tunnel and the section between Segovia Bridge and San Isidro Bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data