Underground Power Infrastructure Project at Hansot
Sector: Power Generation (CCGT) • Location: Hansot, Gujarat, India
Source: The Tribune
Desco Infratech Limited successfully completed and commissioned a major underground power infrastructure project awarded by a company belonging to KP Group. The project involved HDD-based cable laying, installation of HDPE pipes, cable jointing works, OFC cable laying, testing, commissioning, and allied infrastructure activities for approximately 9,150 meters of cable.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Hansot, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- The Tribune
ConstructChat
Ask ConstructChat about Underground Power Infrastructure Project at Hansot
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Desco Infratech Limited successfully completed and commissioned a major underground power infrastructure project awarded by a company belonging to KP Group. The project involved HDD-based cable laying, installation of HDPE pipes, cable jointing works, OFC cable laying, testing, commissioning, and allied infrastructure activities for approximately 9,150 meters of cable. |
Original sector | Power |
Location
Country | India |
State | Gujarat |
City | Hansot |
Source
Source | The Tribune |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
