logo
ProjectBidding, Pre-Design

Underground River Crossing Oldman River

Sector: Telecommunications • Location: Lethbridge, Alberta, Canada

Source: Dodge

AB-2025-02002 The City of Lethbridge Electric Utility (LEU) intends to move high voltage electrical cables from inside the Whoop-Up Bridge to underground conduits across the Oldman River. LEU intends to enter into a contract with an experienced drilling contractor to supply all materials, equipment and labor to install the conduit under the river. The final delivered product will be thirteen condu

Status
Prospective
Sector
Telecommunications, Government, Commercial, Bridge, Power Generation (CCGT), Power Transmission
Location
Lethbridge, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Underground River Crossing Oldman River

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Underground River Crossing Oldman River” is an infrastructure initiative in the Telecommunications sector, located in Lethbridge, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding, Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AB-2025-02002 The City of Lethbridge Electric Utility (LEU) intends to move high voltage electrical cables from inside the Whoop-Up Bridge to underground conduits across the Oldman River. LEU intends to enter into a contract with an experienced drilling contractor to supply all materials, equipment and labor to install the conduit under the river. The final delivered product will be thirteen conduits installed along an estimated 400m drill path and fusion capped just outside the entry/exit po...

Budget

Location

Country

Canada

State

Alberta

City

Lethbridge

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Telecommunications, Government, Commercial, Bridge, Power Generation (CCGT), Power Transmission

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project