logo

Underground Solutions Fusible PVC Pipe Manufacturing Facility

Sector: Waste Processing and Treatment • Location: Batesville, Mississippi, United States

Source: Mississippi Development Authority

Project
Under Construction

Azuria Water Solutions is constructing a new 72,000-square-foot Fusible PVC Pipe manufacturing facility in Batesville. The plant will produce infrastructure technology products for water, sewer, and conduit systems, including pipes used to transport water, wastewater, and other liquids, as well as conduits for electrical and communication cables. The facility is adjacent to an existing Azuria manu

Status
Under Construction
Sector
Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial)
Location
Batesville, Mississippi, United States of America
Updated
22 Jul 2026
Source
Mississippi Development Authority

ConstructChat

Ask ConstructChat about Underground Solutions Fusible PVC Pipe Manufacturing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Underground Solutions Fusible PVC Pipe Manufacturing Facility” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Batesville, Mississippi, United States. Taiyo aggregates data on it from Mississippi Development Authority.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Azuria Water Solutions is constructing a new 72,000-square-foot Fusible PVC Pipe manufacturing facility in Batesville. The plant will produce infrastructure technology products for water, sewer, and conduit systems, including pipes used to transport water, wastewater, and other liquids, as well as conduits for electrical and communication cables. The facility is adjacent to an existing Azuria manufacturing plant and represents an $80 million investment, creating 50 jobs.

Original sector

Infrastructure Technology

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Batesville

Source

Source

Mississippi Development Authority

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2026-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project