Underground Storage Tanks In-Place Closure
Start · Alabama · Last reported Jul 2025
Source: Dodge
The Enterprise City School District is proposing to upgrade their current gasoline and diesel underground storage tank system into a new aboveground storage tank system. The project is to be performed during the 2025 summer break period when the existing fuel system can be shut down. The new AST system must be in full operation before the beginning of the new school year
- Status
- Prospective
- Sector
- Raw Materials, Car parking, Automotive, Consumer Products, Government, Commercial
- Location
- Enterprise, Alabama, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Underground Storage Tanks In-Place Closure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Enterprise City School District is proposing to upgrade their current gasoline and diesel underground storage tank system into a new aboveground storage tank system. The project is to be performed during the 2025 summer break period when the existing fuel system can be shut down. The new AST system must be in full operation before the beginning of the new school year |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Enterprise |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Car parking, Automotive, Consumer Products, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
