logo

Underground work on the city of Murcia’s arterial railway

Sector: Cement • Location: Murcia, Spain

Source: Ferrovial

Project
Active

Ferrovial Business Lines Projects Underground work on the city of Murcia’s arterial railway Murcia, España €23988066 Tender budget 52090329kg Steel bars HA-303386.815m³ Reinforced concrete 734.156m³ Emptying Excavation The project will move the over 5 km separating the vicinities of Nonduermas from the Murcia Station Carmen under the current route, connecting them with UIC-width tracks and makin

Project Information FAQ

Project Information

5 Q
The project “Underground work on the city of Murcia’s arterial railway” is an infrastructure initiative in the Cement sector, located in Murcia, Spain. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Underground work on the city of Murcia’s arterial railway Murcia, España €23988066 Tender budget 52090329kg Steel bars HA-303386.815m³ Reinforced concrete 734.156m³ Emptying Excavation The project will move the over 5 km separating the vicinities of Nonduermas from the Murcia Station Carmen under the current route, connecting them with UIC-width tracks and making them continuous through the rail corridor to Cartagena. The contract covers the Underground Construction of Nonduermas and the Underground Construction of the Station and Barriomar, with the object being making the current rail corridor suitable for implementing High Speed services, compatible with other types of traffic.  Underground work on Nonduermas  With a work timeline of 27 months, the projected route is 2,503 ml long, with a platform for a two-way high-speed rail.  This includes laying two tracks, one of UIC width and the other of a multipurpose width.  Underground work on the Station and Barriomar  The route has a length of 2,830 ml, all underground, with the work timeline being 36 months. This includes building a new Station that will service the new underground rails and is located on the on covering slab of the cut-and-cover tunnel.  It accounts for carrying out an intermediate phase that will enable the underground arrival of the AVE to the  station located 8 m below ground, as soon as the rest of the underground work is done. This stretch is connected to the PHASE 0 construction work that ALDESA is carrying out, which will, upon going into service, be the origin point for fulfilling the project's first milestone, the intermediate phase at 15 months, establishing the partial underground work on the rail yard that will enable putting long-distance trains and vicinities connected by the east side into service.  Below are the diagrams for the rail yards at Murcia's Carmen Station at different phases (the initial stage, an intermediate point at 15 months, and the final stage), according to the construction project. 

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data