Unfoldable Bridge in Austria
Sector: Bridge • Location: Vienna, Austria
Source: Highways Today
The Unfoldable Bridge in Austria was developed by TU Wien using the balanced lowering method, where the bridge is erected in a vertical position and then rotated into a horizontal position. This innovative construction method saves time, money, and resources, with the first application being for two bridges of the Fürstenfeld Motorway S7.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Unfoldable Bridge in Austria was developed by TU Wien using the balanced lowering method, where the bridge is erected in a vertical position and then rotated into a horizontal position. This innovative construction method saves time, money, and resources, with the first application being for two bridges of the Fürstenfeld Motorway S7. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
