Ungheni-Chisinau Natural Gas Pipeline

Sector: Chemical (Industrial) • Location: World

Source: Hydrocarbon Technology

Project
Closed

Moldova is extending the Iasi-Ungheni gas pipeline up to Chisinau, by 120km. Credit: The Deep and Comprehensive Free Trade Area. The Prime Ministers of Moldova and Romania signed a MoU in May 2015 to extend the Iasi-Ungheni gas pipeline to Chisinau. Credit: Government of Moldova. Romania is providing Moldova a grant of €550,000 ($600,285) for the project. Credit: Government of Moldova. The Ungheni

Project Information FAQ

Project Information

3 Q
The project “Ungheni-Chisinau Natural Gas Pipeline” is an infrastructure initiative in the Chemical (Industrial) sector, located in World. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Moldova is extending the Iasi-Ungheni gas pipeline up to Chisinau, by 120km. Credit: The Deep and Comprehensive Free Trade Area. The Prime Ministers of Moldova and Romania signed a MoU in May 2015 to extend the Iasi-Ungheni gas pipeline to Chisinau. Credit: Government of Moldova. Romania is providing Moldova a grant of €550,000 ($600,285) for the project. Credit: Government of Moldova. The Ungheni-Chisinau natural gas pipeline is a proposed 120km extension to the existing Ungheni-Iasi gas interconnector, which was originally built in Moldova in 2015. The 43.2km-long Ungheni-Iasi interconnection project represents the first and only direct gas pipeline connecting Moldova with the European Union (EU). It has a maximum transportation capacity of 1.5 billion cubic metres (bcm) of gas a year. The interconnector was built via an investment of €26m ($27.6m) and currently transports gas from Romania. The gas is being supplied by OMV Petrom (Romania), a subsidiary of the Austrian oil and gas group OMV. A memorandum of understanding (MoU) for the pipeline extension development was signed by the Prime Ministers of Moldova and Romania in May 2015. The extended pipeline will transport the gas received from Romania to Moldova’s capital city Chisinau, which is also the country’s biggest gas consumption area. It is expected to enable Moldova to benefit from the interconnection project by improving its energy security. A joint venture between Transgaz and Eurotransgaz named VestMoldTransgaz (VMTG) is responsible for developing the project on behalf of the Government of Moldova. The gas transmission pipeline will cost an estimated €113m (approximately $120m) and is anticipated to be commissioned by December 2019. The new pipeline will have a diameter of 600mm and a capacity of 1.5bcm of gas a year. It is anticipated to possess a maximum capacity of 240,000Nm³/h at 15°C, a maximum working pressure of 50bar and a project pressure of 55bar. Furthermore, the pipeline is expected to include a 50m-wide safety strip or right of way (ROW). The pipeline will have a design life of 25 years, which will be enabled by cathodic protection based on an impressed current system. Its design life could potentially be extended to 40 years through the partial replacement of the system, including its ground bed and power supplies. The pipeline will be internally lined with an epoxy lining to improve the flow properties and prevent corrosion during storage and operation. It is expected to have an internal surface roughness of approximately 0.05mm. In addition, the pipeline, valves and fittings will be coated with a high-density polyethylene (HDPE) or polyurethane (PU) coating system in order to protect against external corrosion. The field joints, factory-made pipe bends, pipeline block valves and other buried fittings will also be coated with PU. The natural gas pipeline project will comprise five block valve stations occupying a fenced area of 100m² each, along with two gas pressure regulation stations, three pig launcher stations and three pig receiver stations, in addition to the pipeline itself. Additionally, two new compressor stations of 5MW and 6MW respectively will be constructed to enable the full use of the Ungheni-Iasi interconnection project, as well as regulate the pressure inside the pipeline. Furthermore, a high-pressure pipeline is proposed to be constructed from Onesti to Gheraiesti and extending up to Letcani, which will allow the Ungheni-Chisinau pipeline to operate at full capacity. The European Bank for Reconstruction and Development (EBRD) and European Investment Bank will provide sovereign loans of €41m ($45m) each to the Government of Moldova, while the EU has agreed to provide an additional €10m ($11m) investment grant. The Romanian Government will also provide a grant of €550,000 ($600,285) to Moldova for detailed engineering works in support of the gas pipeline’s construction. A land planning institute known as the State Institute for Land Management Planning (IPOT) conducted a study to identify the reference routes for the pipeline. EBRD appointed Fichtner GmbH & Co KG as as a consultant to perform an environmental and social impact assessment relating to the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data