Union City At-Grade Pedestrian Crossing at BART REBID
Sector: Water Supply and Storage • Location: Union City, California, United States of America
Source: Dodge
The Project work includes improvements within and adjacent to the UPRR and BART rights-of-way between the existing Union City BART Station and Duncan Way, as shown and described in the Contract Documents. Within the UPRR right-of-way, the work consists of building at-grade crossing approaches, asphalt conforms (to existing concrete panels), concrete stairs and ramp structures, UPRR maintenance veh
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Car parking, Road, Cement, Waste Processing and Treatment, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Union City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Union City At-Grade Pedestrian Crossing at BART REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project work includes improvements within and adjacent to the UPRR and BART rights-of-way between the existing Union City BART Station and Duncan Way, as shown and described in the Contract Documents. Within the UPRR right-of-way, the work consists of building at-grade crossing approaches, asphalt conforms (to existing concrete panels), concrete stairs and ramp structures, UPRR maintenance vehicle access ramps and associated grading. In addition, drainage pipes and ditches will be constru... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Union City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Car parking, Road, Cement, Waste Processing and Treatment, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
