UNION CITY PEDESTRIAN SYSTEM
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This prroject is to upgrade the pedestrian facilities in Union City, Ga in multiple locations including Lester Ave, US 29 (Roosevelt Hwy) and SR 138 (Beverly Engram Pkwy). Improvements will include remove and replace sidewalk, upgrade wheelchair ramps to ADA standards, and accomodate drainage by installing flumes or catch basins where necessary.
- Status
- Closed
- Sector
- Car parking, Government, Automotive, Road, Waste Processing and Treatment
- Location
- Union City, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about UNION CITY PEDESTRIAN SYSTEM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This prroject is to upgrade the pedestrian facilities in Union City, Ga in multiple locations including Lester Ave, US 29 (Roosevelt Hwy) and SR 138 (Beverly Engram Pkwy). Improvements will include remove and replace sidewalk, upgrade wheelchair ramps to ADA standards, and accomodate drainage by installing flumes or catch basins where necessary. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Union City |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Government, Automotive, Road, Waste Processing and Treatment |
Article published date | 2024-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
