Union Hill Waste Dump Drilling Program
Sector: Mining • Location: Maldon, Victoria, Australia
Source: TipRanks
Kaiser Reef Limited completed a drilling program at the Union Hill waste dump within the Maldon Gold Project, drilling 163 holes over 2,212 meters. The project assesses the potential to convert the waste dump into a low-grade stockpile to support profitable operation of the processing plant and exploration efforts. Initial results are promising with an average grade of 0.6g/t Au. The company is al
- Status
- Closed
- Sector
- Mining
- Location
- Maldon, Victoria, Australia
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Union Hill Waste Dump Drilling Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kaiser Reef Limited completed a drilling program at the Union Hill waste dump within the Maldon Gold Project, drilling 163 holes over 2,212 meters. The project assesses the potential to convert the waste dump into a low-grade stockpile to support profitable operation of the processing plant and exploration efforts. Initial results are promising with an average grade of 0.6g/t Au. The company is also investigating waste dump material at the nearby Nuggetty deposit for ongoing processing potential. |
Original sector | Mining |
Location
Country | Australia |
State | Victoria |
City | Maldon |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
