Union Mine WWTP Centrifuge Control Panel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The fabrication of two (2) new control panels for the two (2) existing GEA Westfalia centrifuges, installation of the control panels, providing auxiliary equipment wiring to the control panels, programming, and testing for proper operation.
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Government, Waste Processing and Treatment, Commercial
- Location
- El Dorado, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Union Mine WWTP Centrifuge Control Panel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The fabrication of two (2) new control panels for the two (2) existing GEA Westfalia centrifuges, installation of the control panels, providing auxiliary equipment wiring to the control panels, programming, and testing for proper operation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | El Dorado |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
