Union Pier Drain
Sector: Water Supply and Storage • Location: Union Pier, Michigan, United States of America
Source: Dodge USA
Installation of (2) culverts of approximately 48 feet length utilizing 78" equivalent elliptical RCP with an average depth of 11 feet. Installation of approximately 1,349 feet of 30" H.D.P.E. Dual Wall, approximately 40 feet of 30" R.C.P., approximately 936 feet of 24" H.D.P.E. Dual Wall, approximately 1,315 feet of 15" R.C.P., and approximately 758 feet of 12" R.C.P. with an average depth of 7 fe
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Installation of (2) culverts of approximately 48 feet length utilizing 78" equivalent elliptical RCP with an average depth of 11 feet. Installation of approximately 1,349 feet of 30" H.D.P.E. Dual Wall, approximately 40 feet of 30" R.C.P., approximately 936 feet of 24" H.D.P.E. Dual Wall, approximately 1,315 feet of 15" R.C.P., and approximately 758 feet of 12" R.C.P. with an average depth of 7 feet. Open channel cleanout of approximately 3,777 feet of drain. Removal and replacement of approx... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
