logo

Unipak-Nile

Sector: Waste Processing and Treatment • Location: Egypt, Arab Republic of

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameEgypt-Unipak-Nile     RegionCentral Asia, Middle East and North AfricaSectorProject No008008Projected Board DateMay 31, 1997Company NameUnipak-NileTechnical Partner and/or Major Shareholders The project is sponsored and will be fully owned by the Indevco Group, a major Lebanese industrial group established in 1953. The Group is 100% privately owned

Project Information FAQ

Project Information

4 Q
The project “Unipak-Nile” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameEgypt-Unipak-Nile     RegionCentral Asia, Middle East and North AfricaSectorProject No008008Projected Board DateMay 31, 1997Company NameUnipak-NileTechnical Partner and/or Major Shareholders The project is sponsored and will be fully owned by the Indevco Group, a major Lebanese industrial group established in 1953. The Group is 100% privately owned by the Frem family. It is involved in the paper and plastic sectors and has 23 affiliated companies in Lebanon, Saudi Arabia, the U.S. and Brazil. Project Cost Including proposed IFC investment Total project cost is estimated at about US$19 million. IFC’s proposed investment is a loan of US$4.5 million.Location of project and Description of site The project will be located in the “6th of October” industrial city, 45km south of Cairo.Description of Company and Purpose of Project The project consists of building a plant to manufacture corrugated boxes, for the local market, with a production capacity of 30,000 tons per year (tpy). In recent years, the packaging industry in Egypt has witnessed a strong growth in line with the overall growth of the Egyptian economy. Current local supply of corrugated boxes does not meet local demand, leading to imports. By setting a manufacturing plant in Egypt, Indevco will achieve large savings in production and transportation costs compared to its present import activities and will allow it to become even more cost competitive in the Egyptian market. The project will contribute directly to Egypt’s economy through job creation and foreign exchange savings resulting from reduced imports. IFC’s main role would be to provide long-term funding in foreign-exchange to the project. IFC will also play an instrumental role in helping the sponsor mobilize additional funding and complete the financial plan. Finally, IFC helped structure the project’s financing by advising the sponsor to have a more conservative leverage than originally envisaged.Environmental Category and Issues This is an environmental category B project according to IFC’s environmental review procedure. Environmental, occupational health, and safety issues include: potential soil and groundwater contamination at the site, adhesives, liquid effluents and workplace air quality. The project will be designed to meet all pertinent Egyptian regulations as well as World Bank guidelines. The limited amount of fresh water, waste water as well as sewage generated by the plant will be handled by the industrial city’s water treatment system which is shared by a number of companies. In addition, the plant will have its own flocculation tank to eliminate material (mainly starch) which might cause clogging in pipes. The new plant will be equipped with modern machinery and equipment which fully meet the highest requirements for working conditions.The is April 15, 1997 from the Public Information Center. Date SPI sent to PIC April 2, 1997For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 676-0365Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data