Unit - 5 T Hangar Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
REMOVE DRAIN TILE CLEANOUT 2 EACH; TYPE SP 9.5 WEARING COURSE MIX (2,B) 200 TON; REMOVE DRAIN TILE 80 LIN FT; TYPE SP 9.5 NON-WEARING COURSE MIX (2,B) 200 TON; STABILIZED CONSTRUCTION ENTRANCE 1 LUMP SUM; 4" PERFORATED DRAIN TILE 448 LIN FT; COMMON EXCAVATION (EV), P 2,300 CU YD; DRAIN TILE CLEANOUT 3 EACH; SUBGRADE EXCAVATION 230 CU YD; 5" CONCRETE VALLEY GUTTER 106 LIN FT; COMMON BORROW, OFF SIT
- Status
- Closed
- Sector
- Aerospace & Defense, Cement, Government, Electric Vehicles (EVs), Manufacturing (Industrial), Commercial, Power Generation (CCGT), Automotive, Waste Processing and Treatment
- Location
- Blue Earth, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Unit - 5 T Hangar Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | REMOVE DRAIN TILE CLEANOUT 2 EACH; TYPE SP 9.5 WEARING COURSE MIX (2,B) 200 TON; REMOVE DRAIN TILE 80 LIN FT; TYPE SP 9.5 NON-WEARING COURSE MIX (2,B) 200 TON; STABILIZED CONSTRUCTION ENTRANCE 1 LUMP SUM; 4" PERFORATED DRAIN TILE 448 LIN FT; COMMON EXCAVATION (EV), P 2,300 CU YD; DRAIN TILE CLEANOUT 3 EACH; SUBGRADE EXCAVATION 230 CU YD; 5" CONCRETE VALLEY GUTTER 106 LIN FT; COMMON BORROW, OFF SITE (CV) 570 CU YD; SILT FENCE, TYPE MS 585 LIN FT; SELECT GRANULAR BORROW (CV) 800 CU YD; SEED MIX... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Blue Earth |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Cement, Government, Electric Vehicles (EVs), Manufacturing (Industrial), Commercial, Power Generation (CCGT), Automotive, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
- TPA Parking Garage & Administration Building
- MDW Terminal & Concourse
- Seattle-Tacoma International Airport (SEA) International Arrivals Facility
- LAX Tom Bradley International Terminal Renovation, Apron, & Concourse Demolition
- SJC North Concourse
