United Energy Distribution Demand Response
Sector: Energy Storage • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
United Energy uses voltage control devices installed at 47 zone substations across its distribution network to deliver demand response (DR) as a participant of the Demand Response initiative. The United Energy Distribution Demand Response project delivered over 150 MW of DR reserve during the three-year trial.Key resultsPreviously, the use of voltage control to provide demand response services has
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | United Energy uses voltage control devices installed at 47 zone substations across its distribution network to deliver demand response (DR) as a participant of the Demand Response initiative. The United Energy Distribution Demand Response project delivered over 150 MW of DR reserve during the three-year trial.Key resultsPreviously, the use of voltage control to provide demand response services has presented a level of risk as it could not be guaranteed that customer voltages would not fall below the stipulated regulated limits, which in turn risks household appliance damage.United Energy has addressed this risk by developing an advanced technique using smart meters to implement voltage reduction without deteriorating their regulatory voltage compliance.Voltage across the network can be reduced by 3% on average to deliver at least 30MW of demand response within 10 minutes when called upon, sustained over a 4-hour period between 10am and 10pm on business days. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
