logo

United Energy Distribution Demand Response

Sector: Energy Storage • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

United Energy uses voltage control devices installed at 47 zone substations across its distribution network to deliver demand response (DR) as a participant of the Demand Response initiative. The United Energy Distribution Demand Response project delivered over 150 MW of DR reserve during the three-year trial.Key resultsPreviously, the use of voltage control to provide demand response services has

Project Information FAQ

Project Information

5 Q
The project “United Energy Distribution Demand Response” is an infrastructure initiative in the Energy Storage sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

United Energy uses voltage control devices installed at 47 zone substations across its distribution network to deliver demand response (DR) as a participant of the Demand Response initiative. The United Energy Distribution Demand Response project delivered over 150 MW of DR reserve during the three-year trial.Key resultsPreviously, the use of voltage control to provide demand response services has presented a level of risk as it could not be guaranteed that customer voltages would not fall below the stipulated regulated limits, which in turn risks household appliance damage.United Energy has addressed this risk by developing an advanced technique using smart meters to implement voltage reduction without deteriorating their regulatory voltage compliance.Voltage across the network can be reduced by 3% on average to deliver at least 30MW of demand response within 10 minutes when called upon, sustained over a 4-hour period between 10am and 10pm on business days.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data