United Lower Modi I SHPP
Sector: Government • Location: Nepal
Source: World Bank Group
United Modi Hydro Power Private Limited, subsidiary of Nepalese construction company United Builders and Engineers Pvt. Ltd., was planning the construction of the 9.9MW Lower Modi I small hydropower plant, in Parbat. Annual output was estimated at 61GWh.
The project had signed a PPA with the Nepal Electricity Authority NEA, and was expected to be operational by August 2011. By September 2012, th
- Status
- Prospective
- Sector
- Government, Hydro, Power Generation (CCGT), Commercial
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about United Lower Modi I SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | United Modi Hydro Power Private Limited, subsidiary of Nepalese construction company United Builders and Engineers Pvt. Ltd., was planning the construction of the 9.9MW Lower Modi I small hydropower plant, in Parbat. Annual output was estimated at 61GWh. The project had signed a PPA with the Nepal Electricity Authority NEA, and was expected to be operational by August 2011. By September 2012, the project was entering the testing phase. The delay was reportedly caused by "repeated strikes, land acquisition issues and government red tape". The project PPA holds penalty clauses for late delivery, but the government does not exercise them. Total cost was unknown, as was the FC date. Estimated here is August 2011, initial exected commissioning date. Total project cost was Rs.1.66 billion (US$19.3 million). Financing was provided by Clean Energy Development Bank, an initiative of Dutch FMO. In June 2012, the NEA increased the tariffs to Rs.8.4 in the summer and Rs. 4.8 in the rainy season. The Kathmandu Post, NEA hikes PPA rate for 7 projects, 26 June 2012. http://www.housingnepal.com/stakeholders/detail/Stakeholder_4282 http://www.newbusinessage.com/Biz%20News/288 http://www.cedbl.com |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Hydro, Power Generation (CCGT), Commercial |
Article published date | 2024-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
