United Lower Modi I SHPP
Sector: Hydro • Location: Nepal
Source: World Bank Group
United Modi Hydro Power Private Limited, subsidiary of Nepalese construction company United Builders and Engineers Pvt. Ltd., was planning the construction of the 9.9MW Lower Modi I small hydropower plant, in Parbat. Annual output was estimated at 61GWh.
The project had signed a PPA with the Nepal Electricity Authority NEA, and was expected to be operational by August 2011. By September 2012, th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | United Modi Hydro Power Private Limited, subsidiary of Nepalese construction company United Builders and Engineers Pvt. Ltd., was planning the construction of the 9.9MW Lower Modi I small hydropower plant, in Parbat. Annual output was estimated at 61GWh. The project had signed a PPA with the Nepal Electricity Authority NEA, and was expected to be operational by August 2011. By September 2012, the project was entering the testing phase. The delay was reportedly caused by "repeated strikes, land acquisition issues and government red tape". The project PPA holds penalty clauses for late delivery, but the government does not exercise them. Total cost was unknown, as was the FC date. Estimated here is August 2011, initial exected commissioning date. Total project cost was Rs.1.66 billion (US$19.3 million). Financing was provided by Clean Energy Development Bank, an initiative of Dutch FMO. In June 2012, the NEA increased the tariffs to Rs.8.4 in the summer and Rs. 4.8 in the rainy season. The Kathmandu Post, NEA hikes PPA rate for 7 projects, 26 June 2012. http://www.housingnepal.com/stakeholders/detail/Stakeholder_4282 http://www.newbusinessage.com/Biz%20News/288 http://www.cedbl.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
