logo

Universal - White Goods

Sector: Metal • Location: Egypt

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

Translated version of this PSD: Arabic The EBRD is considering providing long-term secured senior loan of up to EGP 150 million (around USD 25 million) to Universal Metallurgical Company S.A.E. to finance the completion of the Borrower’s manufacturing facility, including the acquisition of industrial equipment, to increase the Borrower’s capacity to manufacture washing machines. a) Demonstration e

Project Information FAQ

Project Information

4 Q
The project “Universal - White Goods” is an infrastructure initiative in the Metal sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Arabic The EBRD is considering providing long-term secured senior loan of up to EGP 150 million (around USD 25 million) to Universal Metallurgical Company S.A.E. to finance the completion of the Borrower’s manufacturing facility, including the acquisition of industrial equipment, to increase the Borrower’s capacity to manufacture washing machines. a) Demonstration effect of successful restructuring: Currently, all domestic appliances available in Egypt are either assembled locally or imported. The Project will introduce a large scale manufacturing facility to the market, with an expected demonstration, to household appliance companies in Egypt, of the opportunity and benefits to successfully move from simple assembly to manufacturing. Through this shift, the Project will: b) Setting standards of corporate governance and business conduct: Universal has strong commitment to corporate governance and is aiming to achieve international standards in production, environmental and social sphere and corporate governance. The company is working on streamlining its ownership structure and is aiming to introduce comprehensive accounting and management reporting system (SAP – which has not yet been adopted by many companies in Egypt) by 2014 – neither of these attributes are common in Egypt and will set a strong example to follow by other private companies. c) Transfer of skills: Universal is looking to hire around 15 experienced international managers and engineers to operate the plant. It is expected that the strong management team will introduce comprehensive operational procedures and training programs at international standards. Universal Metallurgical Company is part of the Universal group. It was established in 2006 and was initially involved in manufacturing of cut-to-size metal sheets required for the cookers business. In 2010, as a part of the business restructuring, washing machines assembly was added to the company’s product range and since then twin tub, top loading and front loading washing machines have become the company’s core products. EBRD is considering providing a long-term secured senior loan of up to EGP 150 million (around USD 25 million). EGP 510 million (around USD 84 million). Category B. An Environmental and Social Due Diligence (ESDD) was carried out by an independent consultant and consisted of E&S analysis of the investment programme, comprising of new production facility completion and purchase of equipment for washing machines manufacturing (the Project); and top level review of corporate E&S performance of the Company. The ESDD confirmed that Universal has the institutional capacity to implement the Bank’s Performance Requirements (PRs) over time. The E&S issues identified by consultants will need to be addressed and mitigated via implementation of the Environmental and Social Action Plan (ESAP). Key environmental impacts of future operations are associated with potential contamination by metals, particulate matter and VOCs due to surface treatment of metals and painting activities, waste management and recycling, hazardous materials and waste handling, storage and transport procedures, and noise among others. The Project site is situated approximately 5km from the nearest residential zone, thus there are limited effects on public safety. The social issues can be associated with a gender imbalance not-atypical for the country. Occupational health and safety risks can be related to workers exposure to noise, heavy machinery and hazardous substances and can be minimised through appropriate risk evaluation for each position, provision of PPE and training of the staff. The ESAP is still pending agreement with the Company; its main provisions include the following among others: The Company will provide the Bank with Annual Environmental and Social Reports (AESR) and notify on any material accidents or incidents. The Bank will evaluate the Project’s environmental and social performance in accordance with the Bank’s PR’s through reviewing the Client reporting and undertake periodic monitoring visits. None.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data