University Boulevard (State Road 109) Resurfacing and Median Modifications
Sector: Road • Location: Jacksonville, Florida, United States of America
Source: Florida Department of Transportation (FDOT)
Preferred Materials, Inc. was awarded the contract to complete this project, which includes milling and resurfacing University Boulevard (State Road 109) from San Jose Boulevard (State Road 13) to I-95. This project also includes curb and gutters, sidewalks, signing and pavement markings, signalization, lighting and other incidental construction. The project also includes median modifications to r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Preferred Materials, Inc. was awarded the contract to complete this project, which includes milling and resurfacing University Boulevard (State Road 109) from San Jose Boulevard (State Road 13) to I-95. This project also includes curb and gutters, sidewalks, signing and pavement markings, signalization, lighting and other incidental construction. The project also includes median modifications to reduce crashes at high-conflict areas within the project limits: Installation of a directional median opening with traffic separators at Chester Avenue to eliminate the left turn movement from Chester Avenue to westbound University Boulevard, as well as installation of a 4-foot traffic separator from Chester Avenue to Powers Avenue to direct left turn movements to the signalized intersection at Powers Avenue. Installation of a 4-foot traffic separator from west of Richard Street to east of Cagle Road to direct left turn movements to the signal at Richard Street and installation of a left turn directional median at Cagle Road to eliminate the northbound left turn movement at this intersection.Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from San Jose Boulevard to St. Augustine Road from 7 a.m. to 7 p.m. Monday through Friday. No single or double lane closures will be allowed from St. Augustine Road to I-95 from 6 a.m. to 9 p.m. Monday through Friday. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |