logo

University of Utah Student Housing Complex

Sector: Education • Location: Salt Lake City, Utah, United States

Source: Building Design+Construction

Project
Under Construction

The University of Utah is developing a $155 million student housing complex with 1,400 beds specifically for first- and second-year students. The complex consists of two six-story buildings totaling 350,000 square feet, designed to promote student wellness, social connection, and academic success. Amenities include fitness spaces with indoor bouldering, gaming and social lounges, floor-specific ki

Project Information FAQ

Project Information

5 Q
The project “University of Utah Student Housing Complex” is an infrastructure initiative in the Education sector, located in Salt Lake City, Utah, United States. Taiyo aggregates data on it from Building Design+Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The University of Utah is developing a $155 million student housing complex with 1,400 beds specifically for first- and second-year students. The complex consists of two six-story buildings totaling 350,000 square feet, designed to promote student wellness, social connection, and academic success. Amenities include fitness spaces with indoor bouldering, gaming and social lounges, floor-specific kitchens, a large outdoor courtyard, and 17,000 square feet of common dining and community areas. The project features sustainable design elements such as all-electric systems, low-flow plumbing fixtures, LED lighting, climate-responsive site design, and LEED Silver certification. The complex is expected to open in fall 2026.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data