University of Washington Lot E18 Solar Canopy Project
Under construction · Washington · Last reported Nov 2025
Source: 巴士的報
Trinity Energy is collaborating with the University of Washington to deploy a solar canopy system in Parking Lot E18 near the university's baseball stadium. The solar canopy can produce up to 93kW of power and will connect to the City of Seattle and UW's campus electrical grids. It supports future electrification infrastructure including EV charging and fleet operations, transforming the parking l
- Status
- Under Construction
- Sector
- Stadium, Electric Vehicles (EVs), Car parking, Solar, Automotive, Power Generation (CCGT), Education, Government
- Location
- Snohomish, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- 巴士的報
ConstructChat
Ask ConstructChat about University of Washington Lot E18 Solar Canopy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trinity Energy is collaborating with the University of Washington to deploy a solar canopy system in Parking Lot E18 near the university's baseball stadium. The solar canopy can produce up to 93kW of power and will connect to the City of Seattle and UW's campus electrical grids. It supports future electrification infrastructure including EV charging and fleet operations, transforming the parking lot into a clean energy asset without reducing parking capacity. The modular design allows replication across other campus lots, supporting renewable power generation and energy resilience initiatives such as microgrid development. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Washington |
City | Snohomish |
Source
Source | 巴士的報 |
URL |
More Details
Record type | Project |
Sector | Stadium, Electric Vehicles (EVs), Car parking, Solar, Automotive, Power Generation (CCGT), Education, Government |
Article published date | 2025-11-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Stadium projects in United States
- Joint Base Lewis-McChord
- Central 70 Project, Denver
- SDSU Dairy Processing Plant
- Franz Family Bakeries, Springfield, Oregon
- The Rockefeller University Campus Expansion, New York
- Bettcher Innovation Centre (BIC), Ohio, US
- Brooklyn Brewery Facility, Williamsburg, Brooklyn, New York
- Texas Medical Centre’s TMC³ Life Science Campus, Houston, Texas
