University Services Building Mass Timber Project
The owner, status and timeline of this project. A free account opens every field.
Source: Building Design+Construction
The University Services Building at California State University at Chico is a two-story, 22,132-sf mass timber building, the first mass timber building for the California State University system. The project was completed by a Progressive Design-Build Team including GC Swinerton and Dreyfuss + Blackford Architects. Timberlab provided the mass timber construction materials, and Buehler was the engi
- Status
- Closed
- Sector
- Forest Products and Packaging, Commercial, Education, Residential
- Location
- Chico, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Building Design+Construction
ConstructChat
Ask ConstructChat about University Services Building Mass Timber Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The University Services Building at California State University at Chico is a two-story, 22,132-sf mass timber building, the first mass timber building for the California State University system. The project was completed by a Progressive Design-Build Team including GC Swinerton and Dreyfuss + Blackford Architects. Timberlab provided the mass timber construction materials, and Buehler was the engineer. The timber was sourced from sustainably managed forests in Oregon and Montana. The project cost was $14.5 million. |
Original sector | Construction |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Chico |
Source
Source | Building Design+Construction |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Commercial, Education, Residential |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States
- Kings Bay Naval Submarine Base
- Tuffy’s Pet Foods’ Pet Food Manufacturing Facility, Perham, Minnesota, US
- Biosite HQ and Manufacturing Campus, Mera Misa, California
- Centrally Managed Pay-and-Display Parking
- Bradwood LNG Facility, Oregon
- Chevron Richmond Refinery
- AIPC Pasta and Noodle Production Plant
- Hardywood Park Craft Brewery, Goochland County, Virginia, US
