UOW Facilities Management Center Health & Safety Renovation
Bid results · Wisconsin · Last reported Aug 2025
Source: Dodge
In general, the work consists of: The replacement of the heating, cooling and ventilation system with the building offices, shops and garage. The new HVAC system will be tested, balanced and commissioned per DFD Level II Commissioning requirements. The building s electrical system will be upgraded, new lighting throughout and a new photovoltaic solar panel system installed on the roof. The project
- Status
- Closed
- Sector
- Solar, Education, Residential, Power Generation (CCGT), Car parking, Commercial, Automotive
- Location
- Madison, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about UOW Facilities Management Center Health & Safety Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of: The replacement of the heating, cooling and ventilation system with the building offices, shops and garage. The new HVAC system will be tested, balanced and commissioned per DFD Level II Commissioning requirements. The building s electrical system will be upgraded, new lighting throughout and a new photovoltaic solar panel system installed on the roof. The project replaces the existing built-up roofing with new insulation and EPDM roofing, gutters and downspo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Education, Residential, Power Generation (CCGT), Car parking, Commercial, Automotive |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
