logo

Up-Down Sawmill Penstock Repair Pipelining

Sector: Water Supply and Storage • Location: Ledyard, Connecticut, United States of America

Source: Dodge USA

Project
Bidding

The project goal is to eliminate leaking throughout the length of the penstock to ensure continuous operation of the historic sawmill for decades to come. The Connecticut Department of Energy and Environmental Protection (DEEP) certified the registration of the dam and authorized pipelining repairs related to dam safety general permit GP-015 on August 26, 2024.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Hydro, Metal, Government
Location
Ledyard, Connecticut, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Up-Down Sawmill Penstock Repair Pipelining

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Up-Down Sawmill Penstock Repair Pipelining” is an infrastructure initiative in the Water Supply and Storage sector, located in Ledyard, Connecticut, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project goal is to eliminate leaking throughout the length of the penstock to ensure continuous operation of the historic sawmill for decades to come. The Connecticut Department of Energy and Environmental Protection (DEEP) certified the registration of the dam and authorized pipelining repairs related to dam safety general permit GP-015 on August 26, 2024.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Ledyard

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Hydro, Metal, Government

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project