U.P. POWER (SRINAGAR)
Sector: Water Supply and Storage • Location: India
Source: World Bank Group
The Uttar Pradesh Power Project aims to alleviate the power shortages in the Northern region, improve efficiency and introduce new technology to Indian utilities. To achieve these aims the project will indclude the following components; the construction of a 330MW hydropower station near Srinagar, including a gravity dam, intake structures, sedimentation basin, and an outdoor powerhouse with six
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Uttar Pradesh Power Project aims to alleviate the power shortages in the Northern region, improve efficiency and introduce new technology to Indian utilities. To achieve these aims the project will indclude the following components; the construction of a 330MW hydropower station near Srinagar, including a gravity dam, intake structures, sedimentation basin, and an outdoor powerhouse with six 55MW generating units and associated infrastructure and auxiliaries. Associated with this will be resettlement, rehabilitation and compensatory afforestation. Also finance will be the rehabilitation of the Harduaganj thermal station and the reinforcement of the coal handling system at the 1000 MW Obra 'B' power station. 350 km of single circuit 400kv lines will be constructed along with 80 km of single circuit 220 kv line and associated substations and telecommunication facilities. Also, energy meters and maximum load indicators will be installed on 33 kv and 11 kv feeder lines. Finally, consulting services and training will be provided for the execution of the project, and for improvement of the organization and performance, of the utility. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
