logo

U.P. POWER (SRINAGAR)

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Closed

The Uttar Pradesh Power Project aims to alleviate the power shortages in the Northern region, improve efficiency and introduce new technology to Indian utilities. To achieve these aims the project will indclude the following components; the construction of a 330MW hydropower station near Srinagar, including a gravity dam, intake structures, sedimentation basin, and an outdoor powerhouse with six

Project Information FAQ

Project Information

5 Q
The project “U.P. POWER (SRINAGAR)” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Uttar Pradesh Power Project aims to alleviate the power shortages in the Northern region, improve efficiency and introduce new technology to Indian utilities. To achieve these aims the project will indclude the following components; the construction of a 330MW hydropower station near Srinagar, including a gravity dam, intake structures, sedimentation basin, and an outdoor powerhouse with six 55MW generating units and associated infrastructure and auxiliaries. Associated with this will be resettlement, rehabilitation and compensatory afforestation. Also finance will be the rehabilitation of the Harduaganj thermal station and the reinforcement of the coal handling system at the 1000 MW Obra 'B' power station. 350 km of single circuit 400kv lines will be constructed along with 80 km of single circuit 220 kv line and associated substations and telecommunication facilities. Also, energy meters and maximum load indicators will be installed on 33 kv and 11 kv feeder lines. Finally, consulting services and training will be provided for the execution of the project, and for improvement of the organization and performance, of the utility.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data