Update the Standard Assessment Methodology (SAM) Model
Archived · United States of America
Source: Grants.gov
The proposed agreement will have two primary objectives: 1) to collaboratively develop a revised SAM habitat model for salmonids (green sturgeon optional) in the Sacramento River Basin, and 2) to ensure certification of the new SAM model as an effective tool for assessing the impacts of bank protection projects and related habitat mitigation on fish habitat in the Sacramento River Basin. The revis
- Status
- Closed
- Sector
- Rail, Aerospace & Defense, Government, Commercial, Residential, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Update the Standard Assessment Methodology (SAM) Model
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed agreement will have two primary objectives: 1) to collaboratively develop a revised SAM habitat model for salmonids (green sturgeon optional) in the Sacramento River Basin, and 2) to ensure certification of the new SAM model as an effective tool for assessing the impacts of bank protection projects and related habitat mitigation on fish habitat in the Sacramento River Basin. The revised SAM habitat model will be designed to accommodate additional environmental parameters identified through recent monitoring activities. The model should be sufficiently robust to allow evaluation of a broad range of resource management activities and flexible enough to add new species criteria and permit integration with other models / components for a comprehensive ecosystem analysis. Specific tasks include management of habitat model design and implementation, coordination with USACE and other agencies to write a model development plan and to oversee model development, technical support through the certification process, and training to prepare USACE personnel and others. An optional task to develop a model to assess effects on green sturgeon habitat may also be sought. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Rail, Aerospace & Defense, Government, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Rail projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 4BU/US 1BU/US 23BU @ CSX 637621H - GRADE SEPARATION
- CREPE MYRTLE STREET & RAILROAD AVENUE - MT. AIRY
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- CR 385/HORTENSE RD @ NS 637275V
- CR 316/ADAIRSVILLE @ CSX RR (340493C)
- SR 27/VIENNA @ SCL RR
- 124th avenue ne corridor
