Upfront Subsidy for the CLSG Power Interconnection project
Sector: Hydro • Location: Cote d'Ivoire
Source: European Union Africa Infrastructure Trust Fund
The CLSG Interconnection project involves the construction of a 1,350 km transmission line allowing power exports from Côte d’Ivoire to Liberia, Sierra Leone, and Guinea. The interconnector aims to provide these countries with an increased supply of electricity to meet growing demand and to create incentive for hydropower potential, such as in Sierra Leone and Guinea, to be realised. Approximately
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under disbursement |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The CLSG Interconnection project involves the construction of a 1,350 km transmission line allowing power exports from Côte d’Ivoire to Liberia, Sierra Leone, and Guinea. The interconnector aims to provide these countries with an increased supply of electricity to meet growing demand and to create incentive for hydropower potential, such as in Sierra Leone and Guinea, to be realised. Approximately 12.5% of the total Project cost will finance rural electrification, with an EU-AITF Direct Grant Operation to cover the extra costs of implementing this in Sierra Leone. The subsidy of maximum EUR 12.5m will limit the financial risk of the project in the early years of operation, by reducing the costs of the Special Purpose Company during this ramp-up period. The financial projections for the project show that lower than expected trading in the early years of operation of the line would generate insufficient revenue from transmission tariffs, which have to remain affordable, to cover all costs incurred. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |