Upfront Subsidy for the CLSG Power Interconnection project

Sector: Hydro • Location: Cote d'Ivoire

Source: European Union Africa Infrastructure Trust Fund

Project
Under Disbursement

The CLSG Interconnection project involves the construction of a 1,350 km transmission line allowing power exports from Côte d’Ivoire to Liberia, Sierra Leone, and Guinea. The interconnector aims to provide these countries with an increased supply of electricity to meet growing demand and to create incentive for hydropower potential, such as in Sierra Leone and Guinea, to be realised. Approximately

Project Information FAQ

Project Information

4 Q
The project “Upfront Subsidy for the CLSG Power Interconnection project” is an infrastructure initiative in the Hydro sector, located in Cote d'Ivoire. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under disbursement

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The CLSG Interconnection project involves the construction of a 1,350 km transmission line allowing power exports from Côte d’Ivoire to Liberia, Sierra Leone, and Guinea. The interconnector aims to provide these countries with an increased supply of electricity to meet growing demand and to create incentive for hydropower potential, such as in Sierra Leone and Guinea, to be realised. Approximately 12.5% of the total Project cost will finance rural electrification, with an EU-AITF Direct Grant Operation to cover the extra costs of implementing this in Sierra Leone. The subsidy of maximum EUR 12.5m will limit the financial risk of the project in the early years of operation, by reducing the costs of the Special Purpose Company during this ramp-up period. The financial projections for the project show that lower than expected trading in the early years of operation of the line would generate insufficient revenue from transmission tariffs, which have to remain affordable, to cover all costs incurred.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data