logo

Upgradation of Gandikota CBR Lifts & Gandikota Paidipalem Lift Scheme.

Sector: Hydro • Location: Kondapuram, Andhra Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Water Resources Department, Govt. of A.P has come up with Upgradation of Gandikota CBR Lifts & Gandikota Paidipalem Lift Scheme. with a ticket size of 3015 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Construction of new lif

Project Information FAQ

Project Information

5 Q
The project “Upgradation of Gandikota CBR Lifts & Gandikota Paidipalem Lift Scheme.” is an infrastructure initiative in the Hydro sector, located in Kondapuram, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Water Resources Department, Govt. of A.P has come up with Upgradation of Gandikota CBR Lifts & Gandikota Paidipalem Lift Scheme. with a ticket size of 3015 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Construction of new lift scheme to lift 2000 cusecs of water from Gandikota Dam to Chitravathi Balancing Reservoir in addition to the existing lift of 2000 cusecs to lift 10 TMC of water in about 30-35 days is proposed. Construction of new lift scheme for 1000 cusecs of water from Gandikota Reservoir to Paidipalem reservoir in addition to existing lift scheme of 2000 cusecs to lift 6 TMC of water in about 35 days. This project is proposed to stabilize the ayacut under GKLI, PBC, Lingala right canal and ayacut along the Chitravathi river from downstream of Goddumarri Anicut to confluence point of Gandikota Reservoir.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data