logo

Upgrade access control system for bus terminal and maintenance facility

Sector: Road • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

We have 49 doors at our bus terminal and maintenance facility that are currently opened and locked by key. We would like to replace all these key locks with ID cards that are controlled by a central access system. This would enhance security of both facilities for a variety of reasons.

Status
Closed
Sector
Road
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Upgrade access control system for bus terminal and maintenance facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Upgrade access control system for bus terminal and maintenance facility” is an infrastructure initiative in the Road sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

We have 49 doors at our bus terminal and maintenance facility that are currently opened and locked by key. We would like to replace all these key locks with ID cards that are controlled by a central access system. This would enhance security of both facilities for a variety of reasons.

Original sector

Public Transit

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-03-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project