Upgrade and renewal of the Deseronto Water Treatment Plant
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The proposed project involves upgrading the existing facility by renewing and/or replacing aging equipment and adding redundancy in treatment unit processes to conform with current design standards. Coagulation, flocculation, sedimentation, and filtration process will be upgraded to meet current design standards and sized to achieve the approved design capacity of 2946 m3/d. Equipment selection w
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project involves upgrading the existing facility by renewing and/or replacing aging equipment and adding redundancy in treatment unit processes to conform with current design standards. Coagulation, flocculation, sedimentation, and filtration process will be upgraded to meet current design standards and sized to achieve the approved design capacity of 2946 m3/d. Equipment selection will take into consideration the significant challenges in treating Bay of Quinte source water, particularly in summer and fall when algal blooms often occur. Renewal will also include replacement of aging disinfection equipment, and add baffles to existing treated water clearwells to maximize the reliability and efficiency of the disinfection process. Controls will be modernized to SCADA from the original manual control system. Aging electrical control panels, motors, pumps, lighting, building heating, and other building and mechanical systems will be replaced to improve reliability and efficiency. The present facility uses a common area for process controls, office, laboratory, and lunch room. Upgrading would include provision of designated areas for the above noted functions. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
