Upgrade and renewal of the Deseronto Water Treatment Plant
Completed · Ontario
Source: Infrastructure Canada
The proposed project involves upgrading the existing facility by renewing and/or replacing aging equipment and adding redundancy in treatment unit processes to conform with current design standards. Coagulation, flocculation, sedimentation, and filtration process will be upgraded to meet current design standards and sized to achieve the approved design capacity of 2946 m3/d. Equipment selection w
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Residential, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Upgrade and renewal of the Deseronto Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project involves upgrading the existing facility by renewing and/or replacing aging equipment and adding redundancy in treatment unit processes to conform with current design standards. Coagulation, flocculation, sedimentation, and filtration process will be upgraded to meet current design standards and sized to achieve the approved design capacity of 2946 m3/d. Equipment selection will take into consideration the significant challenges in treating Bay of Quinte source water, particularly in summer and fall when algal blooms often occur. Renewal will also include replacement of aging disinfection equipment, and add baffles to existing treated water clearwells to maximize the reliability and efficiency of the disinfection process. Controls will be modernized to SCADA from the original manual control system. Aging electrical control panels, motors, pumps, lighting, building heating, and other building and mechanical systems will be replaced to improve reliability and efficiency. The present facility uses a common area for process controls, office, laboratory, and lunch room. Upgrading would include provision of designated areas for the above noted functions. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Residential, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
