Upgrade for State Highway 2 from Baypark to Bayfair in New Zealand
Sector: Commercial • Location: Baypark to Bayfair, New Zealand
Source: Highways Today
CPB Contractors has won the contract for the second and final phase of a design and construct contract for the upgrade to State Highway 2 from Baypark to Bayfair with a value of approximately US$ 57m (NZ$82m). Works include the building of two flyovers; the first directing State Highway 29A traffic over the East Coast railway line and Te Maunga intersection, and the other directing State Highway 2
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | CPB Contractors has won the contract for the second and final phase of a design and construct contract for the upgrade to State Highway 2 from Baypark to Bayfair with a value of approximately US$ 57m (NZ$82m). Works include the building of two flyovers; the first directing State Highway 29A traffic over the East Coast railway line and Te Maunga intersection, and the other directing State Highway 2 traffic up and over the Manganui-Girven roundabout. In addition, the existing Manganui-Girven intersection will be upgraded, the Te Maunga roundabout replaced with an elevated interchange. Walking and cycling connections will be improved between Baypark and Bayfair. The project is designed to support economic growth in the region by improving the route to the Port of Tauranga, and create a safer and more sustainable roads system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
