Upgrade of Edamon Substation to 400kV
Sector: Power Generation (CCGT) • Location: Thiruvananthapuram, Kerala, India
Source: Times of India
KSEB plans to upgrade the 220kV substation at Edamon to a 400kV gas insulated substation (GIS) to meet the growing power demand and enhance supply stability. This project is part of the Trans Grid 2.0 initiative and aims to strengthen the transmission network in the region.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission
- Location
- Thiruvananthapuram, Kerala, India
- Updated
- 22 Jul 2026
- Source
- Times of India
ConstructChat
Ask ConstructChat about Upgrade of Edamon Substation to 400kV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | KSEB plans to upgrade the 220kV substation at Edamon to a 400kV gas insulated substation (GIS) to meet the growing power demand and enhance supply stability. This project is part of the Trans Grid 2.0 initiative and aims to strengthen the transmission network in the region. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Kerala |
City | Thiruvananthapuram |
Source
Source | Times of India |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
