Upgrade of Flow Meter Installation and Construction of a Protective Insulated Building
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
A flow meter currently monitors the number of litres going into the lagoon. We need to build an insulated building to prevent the flow meter from freezing up during the winter. This meter is a requirement of the Ministry of the Environment and freezing of the meter is not an excuse for improper reporting of litres flowing into the lagoon.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A flow meter currently monitors the number of litres going into the lagoon. We need to build an insulated building to prevent the flow meter from freezing up during the winter. This meter is a requirement of the Ministry of the Environment and freezing of the meter is not an excuse for improper reporting of litres flowing into the lagoon. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
