logo

Upgrade of the main electrical system at the First Street Waterplant

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Replace the obsolete 240 Volt electrical system with 600 V system at the First Street Waterplant. The upgrades will result in improved energy efficiency and reduce plant failures thereby reducing incidents of loss of water and loss of fire protection. This is the first step in a long list of upgrades needed at the Waterplant. In order to upgrade anything in our waterplant we need to convert our vo

Status
Closed
Sector
Water Supply and Storage, Hydro, Road, Power Generation (CCGT), Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Upgrade of the main electrical system at the First Street Waterplant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Upgrade of the main electrical system at the First Street Waterplant” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace the obsolete 240 Volt electrical system with 600 V system at the First Street Waterplant. The upgrades will result in improved energy efficiency and reduce plant failures thereby reducing incidents of loss of water and loss of fire protection. This is the first step in a long list of upgrades needed at the Waterplant. In order to upgrade anything in our waterplant we need to convert our voltage from 240v to 600v first. The 240v system has given us troubles with inconsistent power and the change was recommended by both Ontario Hydro and the Ontario Clean Water Agency (OCWA). The power coming into the plant is 600v but then we use a temporary transformer to reduce the voltage to 240. Once the system is upgraded to 600vm then we will be able remove the step-down transformer used to bring the electrical feed from 600v to 240v. We will then change the 3 phase motors on our 2 high lift pumps and our backwash pump.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Road, Power Generation (CCGT), Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project