Upgrade Power Supply at PWDU and Tank Altitude Building
Sector: Power Generation (CCGT) • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The project proposes to supply and install small, fixed site, emergency generator units at the PWDU (Water treatment plant) and the Water Tank Altitude Building sites. The all weather units do not require an enclosure, simply the construction of a concrete slab and thru connections to the interior including transfer switch.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project proposes to supply and install small, fixed site, emergency generator units at the PWDU (Water treatment plant) and the Water Tank Altitude Building sites. The all weather units do not require an enclosure, simply the construction of a concrete slab and thru connections to the interior including transfer switch. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
