Upgrade Power Supply at PWDU and Tank Altitude Building
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The project proposes to supply and install small, fixed site, emergency generator units at the PWDU (Water treatment plant) and the Water Tank Altitude Building sites. The all weather units do not require an enclosure, simply the construction of a concrete slab and thru connections to the interior including transfer switch.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Commercial, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Upgrade Power Supply at PWDU and Tank Altitude Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposes to supply and install small, fixed site, emergency generator units at the PWDU (Water treatment plant) and the Water Tank Altitude Building sites. The all weather units do not require an enclosure, simply the construction of a concrete slab and thru connections to the interior including transfer switch. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Commercial, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
