logo

Upgrade Supervisory Control And Data Acquisition (SCADA) systems for Cochenour Water Treatment Plant, Balmertown Reservoir Pumping Station and Madsen Water Treatment Plant

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The Supervisory Control And Data Acquisition (SCADA) enabled computers in these facilities date to the construction of the treatment facilities in 2005/06. 10-years has exceeded the service life of the computer hardware/software, and recently support for Windows XP has been discontinued. This would consist of upgrades of Programmable Logic Controller (PLC) hardware and programming. Existing PLCs a

Project Information FAQ

Project Information

4 Q
The project “Upgrade Supervisory Control And Data Acquisition (SCADA) systems for Cochenour Water Treatment Plant, Balmertown Reservoir Pumping Station and Madsen Water Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Supervisory Control And Data Acquisition (SCADA) enabled computers in these facilities date to the construction of the treatment facilities in 2005/06. 10-years has exceeded the service life of the computer hardware/software, and recently support for Windows XP has been discontinued. This would consist of upgrades of Programmable Logic Controller (PLC) hardware and programming. Existing PLCs are reaching capacity which will restrict future programming expansion. The output to the community is the continued assurance of clean drinking water to the communities of Red Lake. Upgrades are as follows: Cochenour water treatment plant (WTP): New SCADA Computer with SCADA software, PLC System. Cochenour WTP PLC, Balmertown Reservoir Pumping Station PLC and Low Lift Pump House PLC will be combined into one PLC. Ethernet TCP-IP distributed I/O racks will be utilized. Low Lift Pump House will utilize existing fiber optic line from WTP to Low Lift Pump House. Installation and commissioning of new equipment. Programming of new system to function as per existing. Balmertown Reservoir Pumping Station: New SCADA Computer with SCADA software. New PLC System, Installation and commissioning, Programming to function as per existing. Madsen Water Treatment Plant: New SCADA Computer with SCADA software. New PLC System. Madsen Plant PLC, BCA PLC and Low Lift pumping Station PLC will be combined in to one PLC. Ethernet TCP-IP distributed I/O racks will be utilized. Low Lift Pumping Station will utilize existing fiber optic line from WTP to Low Lift Pumping Station. Installation and commissioning of new equipment. Programming of new system to function as per existing. The Ministry of the Environment and Climate Change requested the integration of flow monitors for chemical feed systems, complete with alarms and automatic shutdown.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data