Upgrade to existing storm water infrastructure with a Rain Garden to improve quality of storm water discharge
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The addition of a Rain Garden is an example of an improved environmental outcome as it will assist with the removal of total suspended solids, a reduction in the peak runoff/discharge and will reduce the negative impact of stormwater discharge at its outfall in an area of a steep bank and sensitive receptor. This new construction project will increase the anticipated life span of the storm sewer i
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Upgrade to existing storm water infrastructure with a Rain Garden to improve quality of storm water discharge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The addition of a Rain Garden is an example of an improved environmental outcome as it will assist with the removal of total suspended solids, a reduction in the peak runoff/discharge and will reduce the negative impact of stormwater discharge at its outfall in an area of a steep bank and sensitive receptor. This new construction project will increase the anticipated life span of the storm sewer infrastructure down stream of this project and is an enhancement of the remaining storm sewer infrastructure in this catchment area. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
