logo

Upgrades to Legion Park Softball Diamond

Sector: Commercial • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Pre-Construction
  • Remove existing backstop and dugout fencing and replace with new heavy duty chain link fencing and install safety covers over the dugout benches. - Remove existing electrical panel to be replaced with 125 amp, single phase, 12 circuit panel. - Install six-phase timer system with button function to turn the lights on for a specific amount of time. - Replace the equipment shed and utilize the buil

Project Information FAQ

Project Information

5 Q
The project “Upgrades to Legion Park Softball Diamond” is an infrastructure initiative in the Commercial sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

- Remove existing backstop and dugout fencing and replace with new heavy duty chain link fencing and install safety covers over the dugout benches. - Remove existing electrical panel to be replaced with 125 amp, single phase, 12 circuit panel. - Install six-phase timer system with button function to turn the lights on for a specific amount of time. - Replace the equipment shed and utilize the building to house the electrical panel and timer. - Additional upgrades to the grandstand and fencing New wiring, panel and six-mode timer system will be installed. Timer will ensure lights can be turned off for evening events with automatic shut-off after three hours. Backstop and dugout fencing behind and above home plate will be removed and replaced with new infrastructure. Current fencing is aged, broken and poses public safety threat during sporting events. The Legion Park facility serves more than 500 youth and adults in our community each year who play softball, with leagues utilizing the facility six days a week from May to October. Upgrades will provide energy savings to the municipality and increase efficiency, improve public safety through upgraded infrastructure, meet the capital replacement requirements of the asset management plan and will allow more of the population to utilize the facility because of these upgrades.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data