logo

Upgrades to Rijeka’s water infrastructure underway

Sector: Geothermal • Location: Croatia

Source: European Database

Project
Closed

The project covers work on almost 220 km of sewerage infrastructure, of which around 30 km are to be rebuilt and the rest laid from scratch. This extended network will include 126 pumping stations and 25 km of high-pressure pipes for discharge of water. A total of 2 512 small pumping stations are being installed to connect additional users to the sewerage pipelines.Twelve retention basins for mana

Project Information FAQ

Project Information

4 Q
The project “Upgrades to Rijeka’s water infrastructure underway” is an infrastructure initiative in the Geothermal sector, located in Croatia. Taiyo aggregates data on it from European Database.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project covers work on almost 220 km of sewerage infrastructure, of which around 30 km are to be rebuilt and the rest laid from scratch. This extended network will include 126 pumping stations and 25 km of high-pressure pipes for discharge of water. A total of 2 512 small pumping stations are being installed to connect additional users to the sewerage pipelines.Twelve retention basins for management of storm water runoff, 20 storm water overflows for controlled discharge of storm water and three separators for separation of waste water from other substances are under construction.Cutting lossesRijeka’s water supply and waste water collection system is considered to be one of the most complex in Croatia. Although the city is well-served by its water-supply network – with a connection rate of 99.8 % – the infrastructure is ageing and investments in upgrades are necessary to reduce water losses from the system.A further element of the project thus involves replacing water supply pipelines totalling 99.53 km in length, which should reduce water losses from their current level of about 30 % to 23 %.At present, the waste water collection network is much less extensive than the water supply network. The connection rate to the sewerage system is 78.33 %. As a result of the extensions, this is expected to rise to 93.79 %, representing important progress towards the attainment of EU and national waste water service coverage targets.Improved waste water treatmentTo increase the efficiency of waste water treatment in Rijeka, a new treatment plant is to be built on the site of an existing plant, which will be demolished. The existing facility only provides for primary (or mechanical) treatment, which involves the removal of fine solids from the water by settlement in a sedimentation tank. It therefore does not meet the waste water treatment requirements laid down in EU legislation.The new treatment plant will have the capacity to perform secondary (or biological) treatment of volumes of waste water equivalent to those that would normally be produced by 200 000 people. This process uses oxygen to biodegrade dissolved and suspended organic matter in waste water. This is essential to ensure the waste is treated to an adequate level prior to discharge into the environment. Thermal drying of sludge will be carried out at the new plant.Total investment and EU fundingTotal investment for the project “Improvement of the water communal infrastructure - Rijeka Agglomeration” is EUR 289 730 832, with the EU’s Cohesion Fund contributing EUR 165 335 326 through the “Competitiveness and Cohesion” Operational Programme for the 2014-2020 programming period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data