logo

Upgrades to the Harrow-Colchester South Water treatment plant including Low and High Lift Pumps, Motor Control Center Panel and Microstrainer

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

I) Retrofit 4 old low lift pumps (75.8 L/s, 26.5 L/s, 75.8 L/s, and 90.8 L/s) with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and efficient operation of the system with less breakdown and, reduce energy and the carbon footprint. ii) Replace aging low lift and high lift Motor Control Center (MCC) Panels with new panels. This will result in mo

Project Information FAQ

Project Information

4 Q
The project “Upgrades to the Harrow-Colchester South Water treatment plant including Low and High Lift Pumps, Motor Control Center Panel and Microstrainer” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

I) Retrofit 4 old low lift pumps (75.8 L/s, 26.5 L/s, 75.8 L/s, and 90.8 L/s) with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and efficient operation of the system with less breakdown and, reduce energy and the carbon footprint. ii) Replace aging low lift and high lift Motor Control Center (MCC) Panels with new panels. This will result in more reliable and efficient supply in the system with less breakdown and, reduce energy and the carbon footprint. Aging Motor Control Center panels are also becoming a major health & safety risk. iii) Retrofit 2 old high lift pumps (26.5 L/s, 68.2 L/s) and 1 backwash pump (113.7 L/s) with new high efficient pumps which Variable Frequency Drives. This will result in more reliable and efficient operation of the system with less breakdown and, reduce energy and the carbon footprint. iv) Replace the existing communication line between the low lift building and main building. It is becoming unreliable due to age and failure of this would directly impact the operations of the facility. v) Replace 1 existing microstrainer and associated Motor Control Center panel due to the age, the unit is becoming unreliable and replacement parts are not always available. This will result in a more reliable and efficient operation of the unit with less breakdown and reduce energy and the carbon footprint.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data