logo

Upgrades to the Harrow-Colchester South Water treatment plant including Low and High Lift Pumps, Motor Control Center Panel and Microstrainer

Completed · Ontario

Source: Infrastructure Canada

Project
Completed

I) Retrofit 4 old low lift pumps (75.8 L/s, 26.5 L/s, 75.8 L/s, and 90.8 L/s) with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and efficient operation of the system with less breakdown and, reduce energy and the carbon footprint. ii) Replace aging low lift and high lift Motor Control Center (MCC) Panels with new panels. This will result in mo

Status
Closed
Sector
Water Supply and Storage, Commercial
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Upgrades to the Harrow-Colchester South Water treatment plant including Low and High Lift Pumps, Motor Control Center Panel and Microstrainer

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Upgrades to the Harrow-Colchester South Water treatment plant including Low and High Lift Pumps, Motor Control Center Panel and Microstrainer” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I) Retrofit 4 old low lift pumps (75.8 L/s, 26.5 L/s, 75.8 L/s, and 90.8 L/s) with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and efficient operation of the system with less breakdown and, reduce energy and the carbon footprint. ii) Replace aging low lift and high lift Motor Control Center (MCC) Panels with new panels. This will result in more reliable and efficient supply in the system with less breakdown and, reduce energy and the carbon footprint. Aging Motor Control Center panels are also becoming a major health & safety risk. iii) Retrofit 2 old high lift pumps (26.5 L/s, 68.2 L/s) and 1 backwash pump (113.7 L/s) with new high efficient pumps which Variable Frequency Drives. This will result in more reliable and efficient operation of the system with less breakdown and, reduce energy and the carbon footprint. iv) Replace the existing communication line between the low lift building and main building. It is becoming unreliable due to age and failure of this would directly impact the operations of the facility. v) Replace 1 existing microstrainer and associated Motor Control Center panel due to the age, the unit is becoming unreliable and replacement parts are not always available. This will result in a more reliable and efficient operation of the unit with less breakdown and reduce energy and the carbon footprint.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project