Upgrades to the Harrow Lagoon and Pump Station including Aerator, Motor Control Center Panels, Grinder and Sewage Pumps
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
I) 4 existing surface aerators are highly inefficient in terms of process and energy. Installation of 4 high efficient surface aerators will replace these old and aging aerators and result in better treatment process, energy savings and reduce the carbon footprint. ii) Retrofit raw pumps with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and ef
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | I) 4 existing surface aerators are highly inefficient in terms of process and energy. Installation of 4 high efficient surface aerators will replace these old and aging aerators and result in better treatment process, energy savings and reduce the carbon footprint. ii) Retrofit raw pumps with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and efficient supply in the system with less breakdown and, reduce energy and carbon footprint. iii) Installation of an in-line Muffin Monster grinder to cut down troublesome solids and rags that damage pumps and clog valves which cause costly damage and excessive repairs. Currently there is only a manually cleaned bar screen which is conducted on a weekly basis by two operators in a confined space where workers are exposed to a hazardous environment. iv) Replace 1 aging Motor Control Center (MCC) Panel with new panel. This will result in more reliable and efficient supply in the system with less breakdown and, reduce energy and carbon footprint. Aging MCC panels are also becoming a major health & safety risk. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
