logo

Upgrades to the Harrow Lagoon and Pump Station including Aerator, Motor Control Center Panels, Grinder and Sewage Pumps

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Infrastructure Canada

Project
Completed

I) 4 existing surface aerators are highly inefficient in terms of process and energy. Installation of 4 high efficient surface aerators will replace these old and aging aerators and result in better treatment process, energy savings and reduce the carbon footprint. ii) Retrofit raw pumps with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and ef

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Upgrades to the Harrow Lagoon and Pump Station including Aerator, Motor Control Center Panels, Grinder and Sewage Pumps

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Upgrades to the Harrow Lagoon and Pump Station including Aerator, Motor Control Center Panels, Grinder and Sewage Pumps” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I) 4 existing surface aerators are highly inefficient in terms of process and energy. Installation of 4 high efficient surface aerators will replace these old and aging aerators and result in better treatment process, energy savings and reduce the carbon footprint. ii) Retrofit raw pumps with new high efficient pumps which include Variable Frequency Drives. This will result in more reliable and efficient supply in the system with less breakdown and, reduce energy and carbon footprint. iii) Installation of an in-line Muffin Monster grinder to cut down troublesome solids and rags that damage pumps and clog valves which cause costly damage and excessive repairs. Currently there is only a manually cleaned bar screen which is conducted on a weekly basis by two operators in a confined space where workers are exposed to a hazardous environment. iv) Replace 1 aging Motor Control Center (MCC) Panel with new panel. This will result in more reliable and efficient supply in the system with less breakdown and, reduce energy and carbon footprint. Aging MCC panels are also becoming a major health & safety risk.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project