logo

Upgrades to the Munster Drinking Water Pumping Station

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Upgrades include the purchase and installation of a new natural gas standby generator (with sound enclosure) on a reinforced concrete pad, new emergency shower/eyewash system, structural upgrades to the chemical room floor, removal of the communications tower and coordination of the Hydro Ottawa pole mounted transformer replacement. The supply and installation of the generator is required to ensur

Project Information FAQ

Project Information

4 Q
The project “Upgrades to the Munster Drinking Water Pumping Station” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Upgrades include the purchase and installation of a new natural gas standby generator (with sound enclosure) on a reinforced concrete pad, new emergency shower/eyewash system, structural upgrades to the chemical room floor, removal of the communications tower and coordination of the Hydro Ottawa pole mounted transformer replacement. The supply and installation of the generator is required to ensure continuous delivery of drinking water - even during power outages, which have disrupted the delivery of drinking water several times in recent years. The Munster Hamlet Communal Well System is approximately 40 years old and serves the water customers in Munster Hamlet. The pump station building is located on Coldstream Drive southeast of Munster Hamlet. It consists of a single story structure with a basement housing three (3) high lift pumps and other process equipment. The work will replace the current temporary mobile diesel generator. It will be located south of the pump station building and it will power the Munster Pump Station and the future connection to Munster Well #2.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data