logo

Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Pickerel River water Treatment Plant requires a Supervisory Control Data Acquisition System Upgrade and electrical wiring upgrade to the Water Treatment Tower to ensure water continues to flow out of water treatment tower. We presently have a Bristol Programmable Logic Controller (PLC) system but it is not working sufficiently and is showing signs of failure. We are looking at the installation of

Project Information FAQ

Project Information

4 Q
The project “Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Pickerel River water Treatment Plant requires a Supervisory Control Data Acquisition System Upgrade and electrical wiring upgrade to the Water Treatment Tower to ensure water continues to flow out of water treatment tower. We presently have a Bristol Programmable Logic Controller (PLC) system but it is not working sufficiently and is showing signs of failure. We are looking at the installation of an allen bradley compact PLC system. This system is what controls the water treatment plant and water tower which we are urgently in need of to continue to maintain our water to community members to control the chlorine intake and so we don’t open the valves. Also with the replacement of a Iconics Genesis Supervisory Control Data Acquisition Software with the Allen bradley factory talk view Supervisory Control Data Acquisition system with development and runtime software for both the Supervisory Control Data Acquisition and Programmable Logic Controller hardware. This equipment will monitor the water and ensure control of water tower and treatment plant. All computer monitoring and all wiring is done at the water tower on-site. The operations must have the same tool and devices. The computer Supervisory Control Data Acquisition control Graphics is one of these components. The new runtime and software will have a one year support. This project will ensure safe, reliable water supply and reduce the potential burden on the Provincial health system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data